Saturday, April 27, 2019

Disaster Plan Assignment Research Paper Example | Topics and Well Written Essays - 1000 words

Disaster Plan Assignment - Research make-up ExampleThe stress test examines the stability of the system on while handling many coincident functions and processes. Stress testing is far beyond normal operations as it disregard be categorised in to application stress testing and hardwargon stress testing. The strict security measures, both in terms of physical and software security. Biometric identification system and encryption techniques git be implemented to besmirch database security. Moreover, the third step would be to replicate the core services that are running on a specific server or workstation. This will facilitate the employees to entertain the patients, whenever a primary server goes down. Plans and Changes In order to minimize system failure for future, risk analysis is compulsory that will identify totally(prenominal) the critical systems on the profit. It will also demonstrate the factors that may disrupt the critical system on the network. Moreover, it also includes the implementation of adequate controls in order to prevent system failures. Daily supportings are required on daily basis and a mechanism is required that will check the integrity of the backup at the said(prenominal) snip, if the backup is corrupt, new backup can be requested at the same time. It is essential to prevent the backup database also by applying adequate security measures, as database contents are highly classified. In case of a natural disaster, data must be relocated on a separate data center situated far away geographically. Furthermore, to eliminate power issues, PoE can be implemented to minimize electric outage as it contains its own separate electric channel for the workstation and network devices. Root Cause Analysis The major impact that contributed to the system failure problem is the instability of technical school Med system as well as the application that creates database backup. However, primary source of power was restored instantly and replac ed by the secondary sleeper. The impact of Tech Med system resulted in halting all the operations associated with Jones Regional medical examination Center (JRMC). Moreover, the impact of corrupt database backup resulted in a major halt in system operations of the medical center. Manual entries were conducted, as full database recovery is required from journal articles to transactions. Likewise, when the system is not operational, the staff at the medical center has noted all the operational processes manually so that they can be entered, when the system becomes operational. Disaster Recovery Plan The disaster recovery plan covering all the issues and counter measures is demonstrated below (Sandhu, 2002) Threats Counter Measures Power Failure jump out power distribution link Database Failure Backing up data on 3 different locations at the same time by disk mirroring, ciphering, DLT or manual backup on daily basis. System Failure Alternate system to replace the affected system The ft Lock Cabinets IP cameras, biometric fingerprint identification, Vandalism unuttered steel box for Servers and Databases Flood Relocating or replicating the network room Create a duplicate or replica of crucial data servers that are geographically located away evoke water sprinklers, Fire extinguishers Earthquake Relocating data with data centers that are geographically located away Determining the Amount The initial step is to identity the information assets on the network along with the services associated with it. The next

No comments:

Post a Comment